As part of the rebuild of the roading infrastructure following the Kaikoura earthquake Allied supported the numerous contractors working in the area with fuel.

We designed, fitted out and commissioned a 30,000L Logitank. It has been fitted with components to allow for the bulk filling of the tank via a transfer pump and 80mm composite hose, and the dispensing of fuel from a submersible pump, through a dispenser and a nozzle on each side of the container. Fitted on the top is an 8kVa generator to allow the container to be used in isolated environments where mains power may not be available.

It has been designed to allow the tank top fittings to be disassembled and packed away within the containers own footprint for ease and efficiency of transportation. Assembly and disassembly requires no more than two people.