Another design and build project, including obtaining all relevant consents. Working with sub-contractors the site includes canopy, two 70,000L UST's and a 5K AlliedBlue UST, 2205m2 concrete surfaces, petroleum and electrical works.

Project also included landscaping the surrounding area which is irrigated with water stored in a 5000L UST which is fed water from the canopy roof.