As the diesel stop was the first facility constructed in the Riverlands Truck Park it required close liaison with contractors developing the site and constructing the other nearby facilities. The project was a complete turnkey solution and involved installing two 70,000 litre underground tanks, associated pipework and power etc. The challenges in this project were presented by the winter construction period and the high water level of the area.