This project covered the civil and mechanical aspects involving the installation of a new 5,000 litre AGO additive tank, tank level monitoring system, additive and the transfer pump located in the existing Product Recovery Compound.

Also undertaken was an extension to the platform over the existing additive tanks and new piping.