We were commissioned to open the road culvert accross Charlotte Jane Quay containing the bunker/avgas pipeline to the BP Lyttelton Terminal. This enabled NZOSL to access the pipelines for inspection and thickness testing. Once completed the culvert was reinstated. We were required to undertake a traffic management plan and work in with other affected parties i.e. Lyttelton Port Co, BP Oil, Liquid Gas and the local power authority.